Wednesday, July 1, 2009

Agenda Weekly Conference Call 07.02.09 8:30 a.m.

  1. Update from Brent on geothermal, LED Lighting, solar thermal, etc.
  2.            Update from Jeff on conversation regarding water catchment and grey water systems with Cameron and John, and structural progress.
  3.       Update from Michael on subterranean mechanical system. 
  4.       Misc.

Action steps from Weekly conference call 06.25.09

Brent needs to finalize the geo numbers to make sure the field fits.

 Find competitive geothermal contractors and equipment.

 Look at Ledtronics led bulbs.

Jeff is pricing the structure including the cost of 25 and 45mm polycarbonate panels.

John, Cameron, Lisa and Emmanuelle will start to design the rain water system.

John, Lisa and Emmanuelle will provide a proposal for the constructed wetland septic system.

Action Steps from 06.26.09

Conversation with John Grove, Cameron Scott, Jeff Gerber, Lisa Benjamin

1.  Jeff will coordinate and modify a 1' contour scaled survey of existing conditions and add in proposed structure and grading so we have a model to work with

2. John and Cameron will coordinate on the hydraulic systems

3. The water and enegry component will be looked at by all

 

No comments:

Post a Comment