Jeff
Friday, May 15, 2009
New Postings
Please view the latest postings of Scheme "F". The South wall has been lowered to increase the sloped greenhouse glazing to a 4/12 pitch (This wall is now approx. 10' high from the greenhouse ground level.) The East master roof overhang has been reduced by the width of one solar panel since it does not need to fully cover the light monitor below (There are now 24 PV panels on the roof). The structural supports of the greenhouse and the West master wall have been coordinated with each other and the clerestory venting. The SouthEast greenhouse stone wall has been extended to allow for more space between the existing driveway and the boulder retaining wall.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment